Where redesign rework usually appears

  • Designer finalises a wardrobe; factory re-draws panels because the Excel list does not match the last size change
  • Kitchen bases are approved visually, then nesting starts from a hand-typed sheet with wrong grain
  • Quotation uses different board quantities than the cutlist that went to the saw

A practical handoff that stays on one record

  1. Pick a live template — wardrobe, kitchen base, or another catalogue module your shop actually builds.
  2. Configure once — overall size, internals, materials, and finishes on that furniture.
  3. Validate before release — clear blocking manufacturing-rule issues in the workspace.
  4. Generate manufacturing — panels and cutlist from the same module; nest and quote next.

FMOS is furniture-first design-to-manufacturing software. It is not a full architectural CAD suite and does not replace site measurement drawings. The goal is to stop re-typing the module after it is already configured.

Manual vs FMOS (verifiable steps)

StepManual / multi-fileFMOS path
Change width by 50 mmEdit drawing + re-type Excel + rebuild nestChange the furniture; regenerate cutlist / nest from that record
Rule checkShop memory or late QCWorkspace manufacturing rules before package release
Factory listSeparate spreadsheetPrint or CSV from the manufacturing package

India MSME workflow cue

Each registration creates an isolated workspace. Roles decide who can design, validate, nest, and price. Subscription and the 15-day trial checkout happen in the app at app.fmos.in — project quotations stay on the furniture job.

Frequently asked questions

Why do modular furniture jobs get redesigned at the factory?

Often because sizes were re-entered after the design, manufacturing rules were checked too late, or the nest and quote were built from a different list than the drawing.

How does a template path reduce rework in FMOS?

Start from a furniture template or structured custom unit, validate against workspace manufacturing rules, then generate cutlist, nest, and quotation from that same furniture record.

Related

Design-to-manufacturing pillar · Cutlist software · Excel vs FMOS · Pricing